How much does Spain pay for redispatch, and how much does it change by location?
Part 2 of 3 on technical restrictions: what Red Eléctrica pays for redispatch, why the price depends on the place, and why the cheapest bids are not always the ones taken.
Alexandre Danthine · AAG AdvisorsHow much does Spain pay for redispatch, and how much does it change by location?
This is the second of three notes on Spanish technical restrictions. The first maps where Phase 1 and real-time upward redispatch happen and which technologies supply it. This one turns to price: how redispatch compares with the day-ahead market, whether prices vary between provinces, and why the lowest offers are often not selected. These markets are pay-as-bid, so each unit called receives its own offer price, at times with start-up and minimum-run costs added.
At national level, upward redispatch sits around 157 EUR/MWh in 2025, over double the day-ahead level, with real-time higher still. The gap widens because renewables push day-ahead prices down while redispatch relies mostly on gas CCGT. Comparing CCGT bids by province in 2025, the note finds about 146 EUR/MWh in Zaragoza, Cadiz and Valencia against 216 EUR/MWh in Navarra. Plant efficiency explains only about 8 EUR/MWh of that 70 EUR/MWh spread, so the note reads it as a pricing effect where few plants can relieve local congestion.

In the full article
- The provinces where the billions spent on technical restrictions end up, with prices and volumes reconciled
- The number of offers available per technology compared with the volume actually allocated
- Why cheaper bids are passed over, and the consequences for the battery business case
The complete analysis, charts and data are on Substack. Paid subscribers get every article in full, plus the monthly market reports.