Spain’s Curtailment Hotspots
Part 1 [Spanish Curtailment] - where grid curtailment hit hardest and why congestion appears
Alexandre Danthine · AAG AdvisorsWhere did grid curtailment hit hardest in Spain, and why does congestion appear there?
Grid curtailment in Spain jumped in summer 2025. It reached 10.7% of renewable generation in July and 6.8% in August, against a typical level of about 1 to 2% in earlier months and years. This note opens a three-part series on grid curtailment. It deals with location; later parts cover the rules that govern curtailment and whether being curtailed can earn revenue.
The analysis looks at day-ahead grid curtailment, meaning downward redispatch in Phase 1 of technical restrictions. It uses node data the system operator has published since June 2025, which lists the 30 nodes with the highest renewable curtailment. Summed over June to August 2025, curtailment clusters in Extremadura (Cáceres and Badajoz) and Ciudad Real. The three worst-hit nodes are all in Badajoz and lost 367 GWh over the period, about the yearly use of more than 100,000 households. The highest monthly rate came at another Badajoz node in August 2025, where 37.8 GWh of 87.8 GWh produced was curtailed, or 43.07%, from Phase 1 alone.

In the full article
- What drives curtailment at the most affected nodes
- The structural reasons behind the concentration in Extremadura
- Why the usual logic for siting solar plants may need rethinking
- The grid investment paradox facing system operators
The complete analysis, charts and data are on Substack. Paid subscribers get every article in full, plus the monthly market reports.