The Gigawatts Waiting for Spain’s Grid
Part 1 — What the peninsular connection queue contains, and where solar, wind and storage are trying to connect.
Alexandre Danthine · AAG AdvisorsWhat does Spain's grid connection queue contain, and where are solar, wind and storage trying to connect?
The grid has become central to Spain's energy transition, and the connection queue gives an early view of what may follow. This note, the first of two parts, reads the queue for the peninsular system as a filter for where activity is concentrated, not as a forecast of what will be built. The queue mixes competing options, projects at different stages, and hybrid sites where several modules may share one access right.
On 1 July 2026, 53.7 GW of solar PV was operating, while 82.5 GW of solar module power was permitted but not commissioned or still under assessment, equal to 153% of the fleet. Wind shows 32.8 GW installed against 36.5 GW waiting, and pumped storage 3.3 GW against almost 4.0 GW. Batteries stand apart: 210 MW commissioned against 40.1 GW queued, about 191 times the installed base. The note defines each permit stage on the generation and load sides and stresses that neither guarantees delivery.

In the full article
- How solar, wind and storage charging produce three different provincial maps
- Where operating capacity, generation module power and load-side access diverge by region
- Six provinces that pass a conservative screen for material access activity on both sides of the grid interface
- Why module power, export rights and node geography change how developers, IPPs and traders should read each map
The complete analysis, charts and data are on Substack. Paid subscribers get every article in full, plus the monthly market reports.