Article 29 July 2025

Has the Spanish electricity market changed rhythm since the blackout?

Let's deep dive into the Technical Restrictions market before and after the black-out

Alexandre Danthine · AAG Advisors

I have lost count of how many analysts mention that there was a before-and-after “Spanish blackout” in the way Red Electrica operated the grid. Intrigued, I set out to see what changed on either side of that pivotal event.

To be clear, I won't discuss the blackout itself, the reasons why it occurred, or the technical details of how to prevent it in the future; I will provide a straightforward analysis with some valuable insights.

I plan to analyse the numbers from the Technical Restrictions market, the tool Red Eléctrica uses after the day-ahead market, and again in real-time, to secure the grid and keep the lights on, then examine how its role evolved before and after the blackout.

How to think about the Technical restrictions market?

I’ve already written two other articles on the subject, so feel free to check them out (1 & 2).

The Technical Restrictions market is Spain’s safety net for grid security. Once the day-ahead auction locks in the trade for the coming day around noon, Red Eléctrica analyses the grid with this allocation and spot violations of network limits, voltage issues, or other problems. The Day-Ahead Phase 1 will be used to redispatch generators to scale down, while others are instructed to ramp up to mitigate any potential congestion that may appear the next day.

As real-time approaches, fresh forecasts and contingencies trigger a second round of interventions in the Real-Time window. Here, the operator calls on fast-acting units or curtails renewable energy sources to correct last-minute congestion, voltage issues, or unforeseen outages.

In short, Day-Ahead Phase 1 involves planned surgery according to the published schedule, while Real-Time actions are first-aid responses to relieve system stress. Together, they ensure reliability even when the original market outcome proves infeasible.

Any changes since the beginning of the year?

Let’s then have a look at the day-ahead (phase 1) technical restrictions in terms of reasons fo application and technologies. We’ll look from January 1, 2025, to June 30, 2025.


The red line represents the day of the blackout (28th of April 2025). The data on this day can be discarded as incomplete.

On May 1, two days after the blackout, we see an impressive peak at 120GWh.

But what does that represent?

The Spanish system on May 1st was producing approximately 25 GWh per hour, which amounts to 600 GWh per day. This means that more than 20% of the electricity allocated in the day-ahead market was redispatched through this market to get a secure electrical system. It is massive!

Apart from the volumes, which seem to have increased after the blackout, in part due to the time needed to bring back nuclear power (around May 7), the technologies remain the same: gas turbines and nuclear. The amount of renewables curtailed has increased nonetheless. This trend of curtailing more renewables in the summer is something that has already been observed in previous articles.

So, what is the reason for the increase in volumes under the day-ahead technical restrictions?



Voltage is a big part of it. We see two voltage-related reasons: 1) voltage control and 2) overvoltage: the first is to keep the voltage within the allowed band (0.95 p.u. to 1.05 p.u.), and the second is when the voltage has already exceeded this limit.

Most of this increase was aimed at further managing the voltage within the band (voltage control).

Is it due to overreaction after the blackout? Maybe. Later in the article, we’ll also examine whether the increase in volumes observed in May and June is a recurring pattern in previous years.

For the electrical engineers among my readers, it may come as a surprise to see voltage control expressed in MWh rather than in MVAr. Nonetheless, we can interpret that as the gas power plants called to the grid in active power denomination to solve voltage problems. Red Electrica plans to separate the Voltage control market from the technical Restrictions market in the near future.

Let’s then have a look at the real-time technical restrictions in terms of reasons and technologies.

Looking at the real-time market now, it can be observed that there is a slight decrease in volumes after the blackout, which is likely due to the reduced need to call some generation back that was already in place due to the high volumes in day-ahead technical restrictions.

Again, we see this market primarily dominated by fossil fuels. The renewables take an essential share of the needs downwards. Nonetheless, it is less problematic than in day-ahead (as a reminder, curtailments are not compensated in day-ahead) as the bidder can set prices and is not forced to redispatch. Interestingly, we observe a significant number of negative prices in this market (e.g., weighted average price of -152€/MWh), indicating that generators must compensate the TSO with negative prices, resulting in revenue for them.

As a side note, I’m always puzzled by the large negative numbers set by renewables to be curtailed in those markets. How can this be justified at such a low price? Definitely, not the price of a PPA contract. I would be happy to hear your thoughts on this one.

Going to the type of restrictions graph, the real-time restrictions market is mainly used for “Insufficient Upwards Reserve“ and increasingly for “Congestion“.

Insufficient Upwards Reserve was already highlighted in a previous article. It refers to a lack of available generation or demand reduction capacity that can be quickly activated to cover potential shortfalls in real time, endangering system security. In such cases, the System Operator may apply real-time technical constraints.

The increase of real-time technical restrictions to solve constraints is quite concerning, especially the use for basecase congestion, as it can put the system in a dangerous situation.

So, yes, the technical restrictions market has shifted due to an increase in voltage control needs following the blackout, which may be induced by increased caution among operators, as well as some plants needing time to get back online.

Is this increase a new phenomenon?

Let’s take a step back..

Has this trend been ongoing for previous years?

The following graph displays the total energy used in the Technical Restrictions Day-ahead Phase 1 and in Real Time (up and down), summed in absolute value, with a daily granularity and a 7-day moving average for readability.

The green line represents the value from May to June (after the blackout), as this period will be analysed.

The average in the boxes is the average daily volume over this period.

Interestingly, from 2022 to 2025, we see around a 50% increase each year.

The recent rise in volumes isn’t just fallout from the blackout. It’s part of a longer‑running trend driven by four factors: stagnant demand across the peninsula, rapid growth in renewables, shrinking output from dispatchable units, and the slow rollout of battery storage.

How can we stop this increase in costs (see other article) and reduce the rising volumes? Discussion for another article!

Thanks again for making it through the articles. If you liked it or found it valuable, please consider liking and sharing it with three people who might be interested in this content.

I'm happy to answer all the comments (privately or publicly) and look forward to seeing you for the next one!

Cheers,
Alexandre

First published on Substack · 29 July 2025

Get the next article by email. A new article on European power markets every other week, from the bid curve to the order book.

More Articles

Latest articles

All 39 articles, free ones in full and subscriber articles in summary.

AAG Contact

Questions on a market?

Book a 30-minute introductory call. Tell us about your project and your timeline, and we will see whether AAG is the right fit.